Timber frame is erected and the roof structures added. The main timber frame arrives at the end of April and is erected within two weeks. The first floor is installed above the hi-tech joists and the roof trusses are craned into position. After this, the green oak frame is installed around the main house, creating […]
East Harting | Weeks 1-5
Demolition and Ground Works. Work commences in March, first with the demolition of the old bungalow and removal of foundations. Once the site is cleared, a large amount of landscaping is required to lower the ground levels. This means the driveway gradients are much lower and the rear garden will be almost flat when stepping […]