The Kiln | Stage Five

November 14, 2017 By Rob Hall

Once the frame construction is complete, the floor insulation and underfloor heating piping is installed before the floor screed is pumped in. With the flooring in place, first fix can then begin in earnest.

the-kiln-5-architectural-homes-1

the-kiln-5-architectural-homes-2

the-kiln-5-architectural-homes-3

the-kiln-5-architectural-homes-4

 

Filed Under: The Kiln