Work continues a pace in Bosham, with the basement and groundworks now complete and the erection of the timber frame.
This is a SIPS frame (Structural Insulated Panels System) which provides great levels of insulation and structural integrity in a combined solution.
From arriving on site, the whole structure including the roof is erected in just three weeks, allowing trades to commence first fix.