Timber frame is erected and the roof structures added.

The main timber frame arrives at the end of April and is erected within two weeks.

The first floor is installed above the hi-tech joists and the roof trusses are craned into position.

east-harting-house-hi-tech-joists

east-harting-house-roof-trusses

After this, the green oak frame is installed around the main house, creating the spectacular double height spaces at both the front and rear of the property.

east-harting-house-timber-frame

The roof structures are then joined and the roofing team arrive to get the whole structure felted and battened ready for tiling.

east-harting-house-roof-battening

Over 15,000 roof tiles are then ‘bumped’ up onto the roof ready for fitting whilst soffits and facia boards are fixed to the rafters.

east-harting-house-roof-tiles

 

Filed Under: East Harting

  • Home
  • About
  • What We Do
  • Projects
    • Commissions
    • Land Wanted
    • Completed Projects
  • Testimonials
  • Contact Us

Copyright © 2025 The Architectural Building Company ยท Website by Fresh Eyes Agency